KITAKYUSHU SIM Prims 1week price
(Preferred price)
Prim unit price
(At preferential price)
Restrictions
(building height restrictions /
sky restrictions / land editing)
Section A 2003 1375L$(1310L$) 2.94L$(2.80L$) none/none/possible
Section B 1001or981 655L$(635L$) 2.86or2.80L$
(2.77L$or2.72L$)
none/none/possible
Section C 500 325L$(310L$) 2.79L$(2.66L$) none/none/possible
Section D 408 275L$(260L$) 2.89L$(2.73L$) none/none/possible
Section E 91 35L$ 1.65L$ not available on the ground/
1000m above the sky/not possible
Section F 286 195L$(180L$) 2.92L$(2.70L$) none/none/possible
Section G 121 80L$(75L$) 2.83L$(2.66L$) none/none/possible
KUROSAKI SIM  
Section A.B.C.D 450 270L$(260L$) 2.57L$(2.48L$) up to 20m above ground/
over 1000m above sky/not possible
Section E.F.G.H 450 200L$(195L$) 1.90L$(1.86L$) not available on the ground/
1000m above the sky/not possible
KOKURA SIM  
Section S 3832 2500L$(-) 2.80L$(-) up to 20m above ground/
over 1000m above sky/not possible
Section A 2254 1480L$(-) 2.81L$(-) up to 20m above ground/
over 1000m above sky/not possible
Section B 2002 1300L$(-) 2.78L$(-) up to 20m above ground/
over 1000m above sky/not possible
Section C 1515 1000L$(-) 2.83L$(-) up to 20m above ground/
over 1000m above sky/not possible